LM Wind Power Case Study

2 Jan 2020

LM Wind Power was looking for a cooling solution that could effectively cool its large factory floor as well as its offices in summer. EcoCooling had the right solution for the manufacturer that would also ensure it could meet its 2018 carbon neutral target.

About LM Wind Power
LM Wind Power is an international designer and manufacturer of wind turbine blades, helping to power a more sustainable world with renewable energy. In line with its green credentials, in 2016 the company pledged to be carbon neutral by 2018.

Acquired by GE Renewable Energy in 2017, the Danish company was combined with GE owned UK based Blade Dynamics, to strengthen the presence within the industry.

The challenge
Following the merger, the manufacturing materials for the wind turbine blades at the old Blade Dynamics site in Southampton changed. This meant that there were more chemicals involved in the process. Whilst the team doing the manufacturing itself had protection against the chemical gases, there was a requirement to provide fresher air for the office team working nearby.

In addition to this, the nearby offices were uncomfortably hot during the summer and too cold in winter, so there was a requirement for a cooling and heating solution.

LM Wind Power had previously tried other options to cool their offices in summer including small air conditioning units, but they were ineffective in the space and the energy use was far too high. Plus, it did not provide the ‘fresh air’ required for the office team.

What LM Wind Power needed was a heating and cooling solution that was effective within a large open space and was also environmentally friendly to ensure it could meet its 2018 carbon neutral target.

The solution
Seeking a viable solution, LM Wind Power sought advice from EcoCooling installers and environmental control experts, Vent-Tech. It was proposed that a roof-mounted EcoCooling evaporative cooling unit ducted into a heat recovery unit that would also keep the site warm in the winter was the ideal solution.

The proposed units would also provide LM Wind Power with a completely natural way of cooling incoming air during the summer months, at a fraction of the cost of traditional air conditioning systems.

The solution would mean fresh cool air is ducted into the offices via acoustic lined flexible ducting and 16 4-way diffuser grilles.

Impressed with the proposed solution, LM Wind Power opted for the EcoCooling cooling system, which was able to be installed with minimal disruption to on-site operations.

Within weeks, the system was up and running properly with the team at LM Wind Power pleased with the technology and the installation.

The result
The combination of the evaporative cooling and heat recovery units means that together with the existing heating system, the offices are kept at a steady 21°C all year. This is achieved with minimal energy usage and contributed to LM Wind Power reaching its ambitious carbon neutral commitment in August 2018.

Employees now also work in a more pleasant environment, with the system pumping fresh air through the building all year round.

Business benefit

  • A low carbon solution that supports the company’s carbon-neutral commitment
  • Pleasant fresh working conditions for employees all year round
  • A solution that is effective for both the large manufacturing space and offices

EcoCooling Ltd
Website
T: 01284 810586

Symonds Farm Business Park
Newmarket Road
IP28 6RE
Bury St Edmunds, Suffolk
United Kingdom

Energy Saving Data Centre Initiative Secures DCD Award
Product News

Energy Saving Data Centre Initiative Secures DCD Award

We’re thrilled that the EcoCooling supported Boden Type DC project won ‘Nonprofit Industry Initiative of the Year’ at the coveted DCD 2019 awards in London.

Read more

EE Glass Case Study
Product News

EE Glass Case Study

UK glass manufacturer, EE Glass, was looking for a cooling solution for its Portsmouth production facility that would effectively reduce the temperature in the large open shop floor and improve working conditions.

Read more

CARBOGEN AMCIS AG Case Study
Product News

CARBOGEN AMCIS AG Case Study

Leading pharmaceutical company, CARBOGEN AMCIS AG, was looking for a system that could cool and ventilate its facility that was also ATEX rated so that it was safe to operate in such a sensitive environment.

Read more

Olympiad Leisure Centre Case Study
Product News

Olympiad Leisure Centre Case Study

Olympiad Leisure Centre was seeking an effective, cost-saving solution that would ensure a comfortable environment for gym users even on the hottest days of the year.

Read more

Herman Miller Case Study
Product News

Herman Miller Case Study

Herman Miller needed a cooling solution for its factory that would prevent overheating in areas of intensive machine-based manufacturing. EcoCooling was able to provide an effective solution that also reduced team fatigue. 

Read more

GO Outdoors Case Study
Product News

GO Outdoors Case Study

Leading retailer GO Outdoors was looking for a green, low-cost solution for its in-store cooling and wanted an alternative to traditional air conditioning. EcoCooling was able to provide the ideal solution that enabled Go Outdoors to achieve its cooling requirements whilst saving on capital and running costs.

Read more

-