16 Apr 2019
The Leyton Super Hub was built as part of the Mini-Holland project under the London Borough of Waltham Forest Council. Waltham Forest were given £27million of funding by Transport for London to invest in making their streets more accessible and safe for all users.
The funding was used to create designated spaces for cycling, including cycle routes, segregated cycle paths and cycle hubs for secure storage across the borough, redesigned public areas and pedestrianised high streets, and removing unnecessary motor traffic on residential streets.
Situated in one of the busiest commuting areas and central to Leyton town, the Hub needed to be a beacon of the Mini-Holland project, encapsulating the passion and commitment of Waltham Forest towards cycling.
Cyclepods submitted our two-storey design to Waltham Forest Council, ours was the only double level design and it opened the eyes of the Project Managers to the possibilities that could be achieved. Waltham Forest then decided that they would go bigger and better with the Leyton Hub, and decided to make it a project in it’s own right so it would make a bigger impact. Our proposed solution that provided more cycle parking spaces and maximised the use of the limited available space in an innovative and striking design.
This project was a full, turn-key solution from Cyclepods. We conceived the design for the Hub, architected the drawings and planning permission necessary, designed the bespoke cantilever ramp and structure, carried out groundworks and foundation, provided the facilities, storage and technology for the hub and contracted all peripheral aspects such as the electrics, security and site management. Cyclepods worked closely with Waltham Forest Council throughout the entirety of the project, all aspects of the design and build process required involvement from both parties to ensure that all available opportunities were taken advantage of. This close working relationship was particularly beneficial when unforeseen circumstances and delays led to minor setbacks in the construction process. No project is exempt from troubles but having clear communication meant obstacles and problems were easily overcome and served to provide more opportunities for consideration and improvements in delivering the Hub.
Over 80 tonnes of recyclable steel and 50 panes of toughened and laminated glass were used in the construction of Leyton Super Hub. Building such a large structure was a challenger in such a tight space. The Location is nestled between the A12 cutting, High Road Leyton (a main road with heavy traffic and pedestrians) and a residential street. This meant access to site was restricted and site logistics had to be timed meticulously to ensure minimal disruption to the surrounding streets and the public.
The Super Hub is fully-equipped with the most up-to-date, eco-friendly and user-friendly Cycle Hub facilities available and features state-of-the-art access control technology for maximum security. Cyclepods used LED lighting systems to ensure all areas of the Hub are well lit and inviting. These lights are run off low-voltage electricity and are triggered with PIR motion sensors which stay lit as long as movement within the hub is detected. This makes them energy-saving, long lasting and very low maintenance and the extruded aluminium casing makes them extremely tough and vandal-resistant. A CCTV system has also been included in the Hub, due to the very public location and the elevated levels of traffic expected through the Hub.
The storage provided is the Cyclepod’s Easylift two-tier system – one of the most user-friendly, gas-assisted two-tier systems available. Due to the low loading height of the Easylift, it takes minimal effort from users to wheel their bike into place without having to lift the whole weight of the bike. Once loaded, the gas-assist does the rest of the work – the upper arm lifts on its own and just needs to be pushed gently back into place. Each parking space has several secure locking hoops so bike wheels and frame can be locked for extra security. A Cyclepod XL Bike Pump & Fix-It Repair Stand are available on both floors to provide basic tools for bike maintenance and repair. The XL Pump is designed for heavy use and fits both Schrader & Presta valves. There is also a Help Point on both floors in case users ever need assistance.
Secured by Design & National Building Approval
The most unique feature of the Leyton Super Hub is that it is the only Secured by Design Cycle Hub to date, meaning the Hub meets the Police Preferred Specifications for security.
“Secured by Design is a crime prevention initiative operated by the Police Services of the United Kingdom. It combines proven environmental design principles with the use of physical security products to reduce the risk of crime. Independent academic research consistently demonstrates dramatic crime reduction benefits of up to 75%.’”
The Hub was awarded Secured by Design’s National Building Approval and has been equipped with the first Secured by Design automated door system which, combined with Cyclepod’s access control technology, makes the Leyton Hub is one of the safest places in the UK to store your bike! In addition, Cyclepods has joined Secured By Design’s National Building Approval scheme, which involves Secured By Design checking that the organisation’s suppliers meet police standards to help ensure robust quality of all Cyclepods’ installations wherever they are located.
Cycle theft is a real problem in London and across the country, and safe and secure cycle hubs are important to reduce this risk. They not only enable cyclists to store their bikes to keep them safe for when they return but also they assist police reduce crime.” – Guy Ferguson, Secured By Design Chief Executive Officer
Cyclepods Ltd.
Website
T: 0845 0940490
Unit 2 Betsoms Farm
Pilgrims Way
TN16 2DS
Westerham, Kent
United Kingdom
Swanke Hayden Connell Architects approached us to assist them in planning 200 bike parking spaces into a basement area within the new KPMG Head office at Canary Wharf, London. The current area had accommodate 200 bikes spaces but also full change facilities, a drying room, lockers, showers and toilets. Further to this the client wanted to achieve BREEAM out-standing!
Lewes Cycle Hub was a full turnkey project for Cyclepods. We were involved in every step of the process from designing the initial Hub concept to carry out installation and fully equipping the Cycle Hub with state-of-the-art facilities.
In 2016, Cyclepods took on our biggest project to date. We designed and built 8 new Cycle Hubs across the South West Trains Networks as part of their Cycle-Rail Integration project, in partnership with the Department for Transport, local authorities and the Rail Delivery Group.
At Jaguar Land Rover, the existing employee bike storage was outdated, oversubscribed and becoming a hassle to maintain. Only 70 bike spaces were available using wide metal stands which meant that at least 2 locks would be required to lock both the frame and on wheel of the bike. Due to the high number of employees that cycled to work at the factory, the number of spaces needed to improve drastically to accommodate everyone. Cyclepods visited site and drew up a new plan for storage using our Easylift+ two-tier system and double height Brighton shelters to make the most of the space available.