Scope of works:

  • Containment design and installation.Removal of a high voltage network.
  • Replacement of multiple low voltage switch-rooms.
  • Installation of over 10,000m of LV cable.
  • Project management with 3rd parties.
  • Tight power outage constraints on critical circuits.


The Task

Power Testing Ltd successfully won the contract to replace the existing low voltage infrastructure with a new distribution network and also remove a high voltage system in B.A.’s Technical Block C. This complex is critical to the safe operation of British Airways as it is their engineering division’s headquarters. It houses most support engineers and senior managers as well as B.A.’s planning, development, training and technical support facilities. The ground floor contains engine workshops and a large composite/sheet metal repair and paint facility and is used for long-haul casualty maintenance. They simply could not be left without power for long periods.

Working closely with B.A. and Overbury PLC (office fitting/refurbishment), we minimised operational risks and smoothly project managed the entire operation.

Project Achievements

  • Careful planning and coordination to ensure shutdowns were kept to a minimum.
  • Efficient project management involving third parties.
  • Formulation of a delivery approach compatible with power outage constraints on critical circuits.
  • Successful replacement of five low voltage switch-rooms to create a low voltage ring.
  • Removal of a high voltage distribution network.
  • Identification and mitigation of project risks.
  • Full CDM (Construction – Design and Management) regulations compliance.
  • Safe cable containment, pulling and installation.
  • Plant movement/disposal.
  • Switchgear installation and commissioning.



Power Testing Ltd.
Website
T: 01245 266800

33 Hanbury Road
CM1 3AE
Chelmsford, Essex
United Kingdom

Power Testing Launch Charity Partnership with Havens Hospices
Product News

Power Testing Launch Charity Partnership with Havens Hospices

Power Testing are extremely proud to announce a charity partnership with Havens Hospices. Havens is an Essex based charity dedicated to ‘Making every day count’ for people who are terminally ill.

As a company, we have first-hand experience of the wonderful work they do and It gives us immense pride that we will be involved in raising money to help them support and care for children, young adults and adults and their families at the most distressing time of their lives.

The response from our people so far has been amazing and we will continue to keep you posted with the latest news, events and updates as we are busy working on numerous events across the year to get involved in and show our support, starting with the Race4Business in June.





Read more

Power Testing win 2019 RoSPA Gold Award
Product News

Power Testing win 2019 RoSPA Gold Award

For the 2nd year in a row, Power Testing have won the RoSPA Gold Award for our ongoing commitment to raising health and safety standards within the company.

The RoSPA award is internationally renowned as one of the most prestigious health and safety awards, and is the longest – running industry award scheme in the U.K.

We are extremely proud to have received this award again and credit goes to all our people, who continue to demonstrate a great awareness and understanding of the importance of health and safety within the company.



Read more

ATLAS Certified!
Product News

ATLAS Certified!

After around 8 months and a lot of training, auditing and documentation, we have finally been certifiedby the Association of Technical Lightning and Access Specialists (ATLAS).

This will enable us to tender for future lightning protection works and we will now also be exploring all other potential lightning protection works with our existing clients.

Read more

Britvic Soft Drinks - Chelmsford, Essex: Installation & Commissioning
Product News

Britvic Soft Drinks - Chelmsford, Essex: Installation & Commissioning

Scope of works:

  • Low voltage upgrade for efficiency and environmental efficiency.
  • Substation design and construction.
  • Extra protection for adjacent areas.
  • Project management with a number of sub-contractors.
  • Flexible, on-going planning and specification.
  • Protection Grading Study.
  • Traffic management.
  • Flexible planning and development of a specification throughout the project in close consultation with all stakeholders.
  • Replacement of three existing 1000 kVA transformers for new 1250kVA low loss models.
  • Design and construction of a substation.
  • Cable design and specification using a mathematical model.
  • Tracing, excavation, removal and replacement of all cabling.
  • Production of a discrimination study to ensure correct fuse/trip operation.
  • Commissioning of all equipment and cabling.
  • Energisation of new transformers.

Read more

QinetiQ - MOD Shoeburyness: Principal Contractor for LV & HV Infrastructure Upgrade
Product News

QinetiQ - MOD Shoeburyness: Principal Contractor for LV & HV Infrastructure Upgrade

Scope of works:

  • Management of works in line with CDM requirements.
  • Over 10,000m of cable laying.
  • Installation of new switchgear and disinvestment of old equipment.
  • Civil works including cable trenching and construction works for new substations.

Read more

CBRE - Towers 1 and 2 Harbour Exchange, Isle of Dogs, London
Product News

CBRE - Towers 1 and 2 Harbour Exchange, Isle of Dogs, London

Scope of works:

  • Installation & Commissioning.
  • Tight power outage constraints on essential circuits.
  • Reconfigure Landlords / Tenants maintained LV Supplies.
  • Upgrade Transformer / HV Supply monitoring system.
  • Work in conjunction with other contractors, upgrading the LV Distribution Panels.

Read more

Harrods (Creatside), Knightsbridge: Installation, Testing & Commissioning / Cables and Transformers
Product News

Harrods (Creatside), Knightsbridge: Installation, Testing & Commissioning / Cables and Transformers

Scope of works:


Tight power outage constraints due to department store working times.
Replacement of multiple transformers and high voltage transformer feeder cables.
Extensive High voltage A.C. and D.C. testing prior to removal and de-energising of old equipment.
Advise Customer of test sequences, test voltages and test results to confirm equipment integrity.

Read more

Morgan Stanley: Maintenance, Testing & Defect Repairs
Product News

Morgan Stanley: Maintenance, Testing & Defect Repairs

Scope of works:

  • Annual contract (since 2010).
  • Works to be completed out of hours – Easter weekend.
  • Maintenance of High Voltage & Low Voltage switchgear & transformers.
  • Protection of relay testing.
  • Protection relay replacement.
  • Earthing system testing.
  • Defect repairs.

Read more

CBRE - 5 Canada Square: Maintenance, Testing & Installation
Product News

CBRE - 5 Canada Square: Maintenance, Testing & Installation

Scope of works:

  • Annual contract since 20113 weekend shutdowns across each year
  • Maintenance of High Voltage & Low Voltage switchgear & transformers
  • Installation of remote switching panel for VMX switchgear
  • Installation of Ultra TEV Monitoring System
  • Protection relay testing
  • Integral Protection relay replacement
  • Defect repairs